R56 Production Frozen?

Has anyone heard of a short freeze on production on the R56? I was told today from a reliable source that there is an issue with the R56’s front hood and how it meets the front wheel arches. Apparently there is a gap that is just too large for the likes of quality assurance techs. I am told that the freeze should just be for a day or so in order to make the needed adjustments on the production line. Anyone else have any information on this?

2 thoughts on “R56 Production Frozen?”

Comments are closed.